|
|
|
Cost Benefit AnalysisThe key driver behind transfer modelling is cost benefit analysis. Below, a calculator is provided to facilitate this analysis. The leverage provided by modelling is an improvement in the confidence level of the transfer station design. Lost production will always incur some cost, and the greater this cost, the more important it becomes to increase confidence in the transfer design. Calculator
|
|||||||||||||||||||||||||||